FACILITY & ENERGY / READING SERIES
Every decision here follows a reading taken somewhere.
Hotarubi Systems studies how lighting, air conditioning, ventilation, refrigeration, and hot water actually draw power across the hours of a building's day — then puts the findings in front of the people who run it.
Start a conversation
01 / WHAT WE DO
Readings before recommendations
We work from the utility records and sub-meter data a building already produces. Before anything is proposed, we establish where consumption occurs, which system accounts for it, and how much of it happens outside occupied hours — a pattern that shows up in most buildings we look at, and one that is usually the first thing worth addressing.
CIRCUIT INDEX
02 / HOW WE READ A BUILDING
Three instruments, one report
Pattern reading
Consumption is mapped by system and by hour band, so out-of-hours draw is visible rather than buried in a monthly total.
Early warning
Operating data from air conditioning and ventilation equipment is watched for the gradual drift that tends to come before a fault.
Schedule review
Control schedules are checked against how the building is actually occupied today, not how it was occupied when the schedule was written.
A comfort note
Anything that touches occupant comfort is written up for discussion. Nothing that affects how a space feels is changed on our own authority.
03 / PROCESS
From records to a written report
STEP 1
Records gathered
Existing utility data and available sub-meter readings are collected — no new equipment required to begin.
STEP 2
Systems mapped
Consumption is attributed to lighting, HVAC, ventilation, refrigeration, and hot water by hour band.
STEP 3
Findings reviewed
Adjustments are drafted with their expected effect and uncertainty stated plainly.
STEP 4
Report delivered
A written report and a list of adjustments worth examining are handed over for your team to weigh.
04 / IN THE FIELD
What the readings tend to show
3 wk
Typical scope for a first consumption pattern analysis
5
Systems commonly reviewed across a building's circuit index
JP
Based in Okayama, working with buildings across Japan
0
Automatic changes made to comfort settings without discussion
05 / SERVICES
Three ways to start reading your building
Consumption Pattern Analysis
A first look at when and where a building draws power, using records it already has.
Learn more →
Predictive Maintenance Setup
Monitoring that flags the drift preceding a fault, before it reaches the occupants.
Learn more →
Control Schedule Review
Checking timing schedules against how the building is occupied today.
Learn more →06 / GET IN TOUCH
A short conversation is usually enough to start
Send a note about your building and what you'd like to understand better. We'll reply with what data would help and roughly what scope would suit it.
Tell us about your building
Fields marked required are the only ones we need to begin.
COMPANY INFORMATION
Registered as
Hotarubi Automation Godo Kaisha
Address
2-7-14 Omotecho, Kita-ku, Okayama 700-0822
Phone
+81 86-237-5914
info@domain.com
Domain
domain.com